2024-ready NOV National 110U 1500HP land rig featuring a walking system, automatic catwalk, and iron roughneck. Three mud pumps including an August 2022 overhaul, four CAT 3512A engines, and a 500-ton AC top drive. API Cat IV inspection current with approximately four years remaining. Last operated April 2023; engines run regularly through January 2024.